Free Snag List Template for Construction [2026]
Published: 2026-03-05
Free to use
No sign-up required
A professional, ready-to-use construction snag list template for 2026. Track defects, assign responsibility, set deadlines.
Purpose
A snag list (also called a punch list or defects list) is a document used to record defects, incomplete work, or items that do not meet the required standard during or after construction. It is typically compiled during inspections before practical completion and is used to ensure all outstanding issues are resolved before handover to the client.
When to Use This Template
- During pre-completion inspections and walkthroughs
- Before practical completion and client handover
- During defects liability period inspections
- When a client or architect identifies issues during visits
- For internal quality checks before inviting external inspection
- To track and close out remedial works systematically
The Template
SNAG LIST / DEFECTS SCHEDULE
| Project Name: | [Enter project name] |
| Site Address: | [Enter site address] |
| Inspection Date: | [DD/MM/YYYY] |
| Inspected By: | [Name, role, company] |
| Contractor: | [Main contractor name] |
| Contract Ref: | [Reference number] |
| Inspection Type: | [Pre-completion / Defects liability / Final] |
Defects Schedule
| No. |
Location |
Description of Defect |
Priority |
Responsible Party |
Target Date |
Status |
Date Closed |
| 1 |
[Room 101, Ground Floor] |
[Paint finish scratched on door frame — needs touching up] |
[Low] |
[Decorator] |
[DD/MM/YY] |
[Open] |
|
| 2 |
[Kitchen, Unit 3] |
[Worktop joint not sealed — water ingress risk] |
[High] |
[Joiner] |
[DD/MM/YY] |
[Open] |
|
| 3 |
[Bathroom, 1st Floor] |
[Tile grout cracked around bath panel — re-grout required] |
[Medium] |
[Tiler] |
[DD/MM/YY] |
[Open] |
|
| 4 |
[Hallway] |
[Socket face plate not flush with wall — needs adjusting] |
[Low] |
[Electrician] |
[DD/MM/YY] |
[Open] |
|
| 5 |
[External, South elevation] |
[Mortar staining on brickwork below windowsill — clean down] |
[Medium] |
[Bricklayer] |
[DD/MM/YY] |
[Open] |
|
| [Add additional rows as required] |
Summary
| Total Items: | [Number] |
| High Priority: | [Number] |
| Medium Priority: | [Number] |
| Low Priority: | [Number] |
| Target Completion: | [DD/MM/YYYY] |
| Re-inspection Date: | [DD/MM/YYYY] |
Sign-Off
| Role | Name | Signature | Date |
| Inspector | | | |
| Site Manager | | | |
| Client Rep | | | |
How to Customise This Template
- Use a consistent numbering system that carries through re-inspections
- Be very specific about locations — room numbers, grid references, or floor levels
- Photograph each defect and reference the photo number against the snag item
- Assign priority levels consistently: High = safety or weathertightness, Medium = functional, Low = cosmetic
- Set realistic target dates and follow up relentlessly
- Never close an item until you have physically re-inspected it yourself