Site paperwork,
done from
your phone.

RAMS, method statements, daily site diaries, snag lists and audits, sorted in minutes while you are stood on site. No clipboard. No office run. No subscription.

Prefer the browser? Buy and run it on the web. Already set up? Log in.

£14.99
One payment
No subs
Yours to keep
iPhone + iPad
On the App Store
Works offline
Syncs on signal
UK new build housing site under construction with scaffolding
FORGE Command app showing today's site priorities, critical path and labour tracker
Today on site
22 on site
RAMS generated
in 2 minutes
Two construction workers in hard hats checking paperwork on site Ref 00 · The old way
The problem

The paperwork follows you home.

Site managers lose hours every week to admin. Diaries written up at the kitchen table, RAMS copied from last year's job, snags scribbled on the back of a drawing, photos lost in a phone full of photos.

  • Records get written up late, so the detail is already gone.
  • Method statements get reused without being checked against the job.
  • Compliance gaps only show up when the principal contractor asks.
  • Nothing is in one place, so finding anything is a hunt.
What it does

One app for the whole site register.

Six tools that cover the paperwork a UK site actually runs on. Open the app, fill it in on the spot, share it as a clean branded PDF.

01
Site Diary
Daily recordLog progress, labour, deliveries and delays in seconds, with the date, weather and location stamped on automatically.
02
RAMS & Method Statements
DocumentsGenerate risk assessments, method statements, toolbox talks and permits to work that match the job in front of you, not last year's.
03
Smart Audits
InspectionsRun safety and quality checks from your phone, attach photos as evidence and keep a clear record of what was inspected and when.
04
Snag List
DefectsCapture a snag with a photo, a note and a location in three taps, then track it through to sign off without the spreadsheet.
05
Regulations Library
ReferenceUK building and CDM regulations on hand in your pocket, so you can check the detail without leaving the site.
06
GPS + Weather Stamping
EvidenceEvery entry carries the time, the location and the conditions, so your records stand up when it matters.
See it in action

See the records FORGE produces

Real examples of the site paperwork you get, filled in on the spot and shared as a clean, branded PDF. Every record is GPS and weather stamped for you.

Example: Site Diary

Plot 12, Maple Rise

14 July 2026. GPS location and weather recorded automatically: dry, 18C, light wind.

Labour on site: 6 (2 bricklayers, 1 hod carrier, 3 groundworkers).

Works completed: First-floor blockwork up to DPC. Drainage connected to the plot boundary.

Deliveries: 2 packs of facing brick, 1 load of Type 1.

Delays: 40 minute hold on the concrete pour waiting for the pump.

Example: Snag List

SN-014, Plot 12 kitchen

Raised 14 July 2026, photo attached.

Description: Chip to the worktop edge by the sink cut-out. Repair or replace before handover.

Trade: Worktop fitter.

Status: Open, tracked until signed off.

Get FORGE Command

Examples shown. Every report is yours, GPS and weather stamped, exported as a branded PDF.

Who it is for

Built around the people who run the job.

One app, set up to suit the way each role on a UK construction site actually works.

Role 01

Site Manager

Keep every project, diary and record in one place and walk the site already on top of it.

Role 02

Foreman

Log progress, raise snags and brief the gang without reaching for the clipboard.

Role 03

Project Manager

See where each job stands across phases and trades, from groundwork to handover.

Role 04

H&S Officer

Run audits, generate RAMS and keep a clean compliance trail that stands up to scrutiny.

Role 05

Contracts Manager

Keep records consistent across multiple sites and teams without chasing paper.

Role 06

Quantity Surveyor

Pull accurate, time stamped site records when you need the evidence behind the numbers.

The price

One payment. Then it is yours.

No monthly fee, no per seat charge, no upsell. Where other site apps charge every month, you pay once on the App Store and keep it for the work you do every day.

  • All six site tools, included from day one
  • iPhone and iPad, plus the web app in your browser
  • Branded PDF export for every document and report
  • Works offline on site and syncs when signal returns
  • Built and supported in the UK, part of the Hitchens Group
FORGE Command · Full app
£14.99
One payment. No subscription.
Download FORGE Command on the App Store Buy and run on the web
iPhone · iPad · Web · UK construction
Questions

The short answers.

Is it really one payment?

Yes. FORGE Command is 14.99 pounds, paid once. There is no subscription and no per seat fee.

Does it work without signal?

Yes. You can log diaries, snags and reports offline on site, and the app syncs when you are back in signal.

What can I generate?

Site diaries, RAMS, method statements, toolbox talks, permits to work, audits and snag lists, all as clean branded PDFs.

Which devices does it run on?

iPhone and iPad through the App Store, and the web app in any browser. Your records stay in sync.

Is it built for the UK?

Yes. It is made for UK construction, with UK building and CDM regulations and the documents UK sites need.

Who is behind it?

FORGE Command is built and supported in the UK as part of the Hitchens Group.

Email tips

Paperwork tips by email.

Practical advice on site diaries, RAMS, audits and keeping records straight, written for UK site managers, foremen and SME contractors. Short, useful and only sent when there is something worth reading.

By subscribing you agree to receive emails from FORGE Command. We keep your address private and you can unsubscribe with one click.