Site diary for a refurbishment: what to record

A refurbishment is a job full of surprises. You are working on a building someone else built, often years ago, and the real scope only appears once the strip-out starts and you see what is behind the walls. That makes the daily site diary more valuable than on almost any other job, because the discoveries you record are what justify the variations and the time. This guide sets out what a refurbishment diary should capture, a worked example of a real day, and how to log it from your phone without losing an hour to paperwork.

What a site diary for a refurbishment needs to capture

A generic template records the weather. On a refurb the value is in recording what the building turned out to be, and how that changed the work. Record these every day:

Log the refurb day from your phone

FORGE Command captures the diary, photos and GPS, weather and time stamp in one place, then exports a branded PDF for the file. One payment of £39.99, no subscription.

Get FORGE Command

A worked refurbishment diary example

Here is what a solid entry looks like for a single day on a strip-out and alteration of an existing property. It is illustrative only, but it shows the level of detail that stands up later.

Thursday. On site: strip-out gang (3), electrician (1) isolating, site team. Work: continued strip-out to ground floor. Discovery: suspected asbestos insulation board to ceiling void, plot area 2, work stopped in that area pending survey, principal contractor informed. Discovery: existing wiring to ground floor found in poor condition and not to current standard, electrician isolated and made safe, likely rewire beyond original scope. Structure: engineer confirmed the proposed opening to the rear wall, steel on order. Services: gas capped and confirmed by others. Waste: 3 loads removed (tickets 2210 to 2212). Instruction: client agreed to asbestos survey before further strip in that area, logged as variation. Delay: ground floor strip stood down in the affected area from 10:30. Photos: suspected ACM to ceiling void, existing wiring condition, capped gas.

Compare that to "carried on stripping out, found some old wiring". One records the surprises and the money that follows them. The other records nothing you can rely on.

Why it matters on a refurbishment

A refurbishment dispute is almost always about the difference between the job that was priced and the job the building turned out to need. The only thing that settles it is a dated record of what was found and when.

If asbestos, rot or non-compliant existing work appeared once the strip-out started, a photograph with a date is what supports a fair variation and a fair extension of time. If the building was occupied, the diary of agreed hours and disruption is what answers a complaint about noise or access. And a refurb covers up its own evidence just like a new build, so the photo of the existing structure or services before they are boarded over is the only proof of what was there. The record has to be made on the day, or the surprise becomes an argument you cannot win.

Paper vs phone on a refurbishment site

A paper diary struggles on a refurb. The discoveries come thick and fast during strip-out, the photos of what was found pile up on a phone with no link to the entry, and matching the right image to the right variation weeks later is guesswork.

Logging from a phone fits how a refurb actually runs. The photo of the asbestos or the failed wiring attaches to that day and that discovery, timestamped as you make it, and the record cannot be quietly rewritten afterwards. Older buildings and stripped-out floors often have no signal, so the tool has to work offline and sync later. A diary that needs a connection to save is no use in the middle of a gutted building.

Frequently asked questions

What is different about a refurbishment site diary?

A refurbishment works on an existing building, so the diary has to record what is found once you open things up: asbestos, hidden services, rot, and existing work that is not to standard. These discoveries drive the variations and delays, so the record of what was found, with photos and dates, is what supports a fair account of the extra work.

How do you record variations on a refurb?

Log each discovery on the day with a photo, note the instruction that follows and who gave it, and record the time or work affected. Refurbishment is variation-heavy because so much is unknown until the strip-out, so a clear contemporaneous trail is what turns a surprise into an agreed variation rather than a dispute.

What extra points matter in an occupied building?

Record the working hours agreed, dust and noise controls, the areas handed over or kept live, access arrangements and any disruption to the occupier. If a dispute arises about disruption, the diary is the record of what was agreed and what was done.

How does FORGE Command help on a refurbishment?

FORGE Command lets the site lead log the day from a phone in a couple of minutes, attach photos to each discovery and variation, and have every record stamped with GPS, weather and time. It works offline, then syncs, and exports a branded PDF for the file. It is a one payment of £39.99 with no subscription.

Capture the refurbishment diary in minutes

Diary, snag list, audits and RAMS in one app, stamped with GPS, weather and time, working offline and exporting a branded PDF. One payment of £39.99, no subscription.

Get FORGE Command

Download FORGE Command on the App Store · See the features · See pricing

Related: what a defensible site diary records, site diary for a new build, site diary for groundworks, snagging list for a new build.